Sustainable Production
The production facility, which is planned to be a green building in accordance with Leed standards, which was designed in October 2021, aims to benefit from environmentally friendly solutions such as renewable energy sources and waste water use systems, and the project is expected to be completed in 2024.
In this process, we will use our raw material and energy needs efficiently and focus on projects that will reduce our Carbon Footprint without burdening our natural resources (air, water, soil). Thus, we will minimize our impact on Greenhouse Gas emissions, which is the most important cause of global warming. With the application of rooftop solar energy panels, we aim to meet a significant part of our electricity needs and contribute to the prevention of global warming.